NIC BOYES

    Saudi Arabia · Riyadh Province

    Qiddya

    Qiddya is one of the Public Investment Fund's giga-projects, rising on the Tuwaiq escarpment forty kilometres west of Riyadh. The site sits within a landscape rich in archaeological and palaeontological evidence, where the brief is no longer to restore a single monument but to integrate millennia of heritage into a city being built from the ground up.

    Heritage Context

    About Qiddya

    The Tuwaiq escarpment carries some of the oldest evidence of human presence on the Arabian Peninsula, including Acheulean lithic scatters, Neolithic rock art and rock-cut tombs dating from the late prehistoric and early historic periods.

    Qiddya's development boundary encompasses fossil-bearing Jurassic limestones and Bronze Age cairns, and the masterplan commits to identifying, recording and where possible integrating these into the cultural offer of the new city.

    The project is governed by the Qiddya Investment Company, working alongside the Saudi Heritage Commission and the Ministry of Culture, with international heritage consultants providing the specialist input that conservation at this scale demands.

    Conservation Challenges

    What we encounter in Riyadh Province

    Construction-Adjacent Archaeology

    Archaeological deposits sit immediately adjacent to active construction zones and require careful protection, monitoring and watching briefs.

    Rock-Art Vulnerability

    Pecked and incised rock-art panels on the Tuwaiq cliffs are vulnerable to vibration, dust deposition and inadvertent damage from increased visitation.

    Cairn and Tomb Recording

    Stone cairns and rock-cut chambers across the development footprint require systematic survey before any ground works.

    Heritage Interpretation Design

    Integrating archaeological remains into the masterplan demands close collaboration between conservators, archaeologists and the project's design teams.

    Climate-Resilient Display

    Any heritage that is to be displayed in situ needs treatment regimes that withstand decades of desert exposure with minimal intervention.

    Our Approach

    How we work here

    Our role on giga-project work is consultative — providing condition surveys, photogrammetric recording, treatment specifications and contractor briefing notes that fit within the project's governance structure.

    All recommendations are framed against ICOMOS principles, the Riyadh Charter and Saudi Heritage Commission requirements, ensuring the heritage layer of the masterplan is defensible internationally as well as locally.

    Where rock-art and archaeology can be left in situ, we design buffer zones, monitoring regimes and visitor-access strategies that protect the resource for the lifetime of the development.

    Notable sites & features

    • Tuwaiq escarpment rock-art panels
    • Bronze Age stone cairns
    • Pre-Islamic rock-cut chambers
    • Acheulean lithic scatter sites
    • Jurassic-age palaeontological exposures

    Frequently asked

    Can heritage be integrated into a giga-project of this scale?

    Yes — but only when archaeological survey is completed early, recommendations are built into the masterplan rather than retrofitted, and contractors are briefed on protection measures before mobilisation. We work at that early stage.

    How do you protect rock-art during construction?

    Buffer zones, vibration monitoring, dust-suppression specifications and exclusion fencing — combined with a clear chain of responsibility between the construction manager, archaeological monitor and conservation consultant.